V.
Trade Fair Participation
D. Stand Impact
Activities & time schedule
The planning procedure starts at least 6 -9 months before the trade fair takes place. The following activities should be determined by contents and time:
- Register with organizer (9 months before)
- Briefing and rough stand design (8 months)
- Planning assembly and disassembly (8 months)
- Construction of booth (6 to 2 months)
- Preparing furniture, equipment and exhibits (6 to 1 months)
- Compiling material (3 – 1 months)
- Transport of material (4 to 3 weeks)
- Assembly of booth (2 – 1 week)
- Handing over of booth (day before trade fair)
- Disassembly of booth
- Transportation to company
- Repair and storage

|